top of page

EnBrilion Data Center

Immersion Liguid cooled data centers

Immersion liquid cooling

Immersion liquid cooled infrastructure for next-generation energy and compute

The EnBrilion Data Center combines advanced energy storage, solar PV integration, and high-performance AI computing in a modular and sustainable solution. By pairing immersion-cooled batteries with immersion-cooled GPUs, it delivers exceptional energy efficiency and reliable 24/7 operation for demanding AI/ML workloads.

At the core is our single-phase immersion licuid cooling system, where both batteries and GPUs are submerged in a dielectric fluid. In combination with a closed-loop liquid cooling cycle and advanced thermal management, heat is removed quickly and efficiently ensuring maximum performance with minimal energy consumption.

Key Benefits
- Efficiency. Reduces cooling energy use; achieves PUE 1.05–1.1 even in warm climates.
- Performance. Supports continuous AI/ML operation without throttling or overheating.
- Sustainability. Designed for seamless integration with solar PV and energy storage systems.
- Resilience. Containerized design with PV input and diesel backup for uninterrupted operation.

Core Features
- Modular Immersion liquid Cooled Data Centers
- 40-foot prefabricated units. Immersion liquid cooled IT containers for scalable deployment.
- Modular server architecture. Simplifies upgrades and maintenance, reducing O&M costs.
- Immersion liquid cooling. Ultra-low auxiliary power; industry-leading PUE 1.05.
- High-density design. Up to 264% higher compute density per m² vs. traditional air cooling.
- Flexible integration. Compatible with existing power, networking, and cooling infrastructure.
- Scalable POD units. Configurable up to 2000 P to match operational requirements.

Intelligent Full-Stack Solution
- Plug-and-play deployment. Prefabricated modules reduce build time by 5–8 months.
- Ultra-low noise. <62.6 dB, suitable for urban and sensitive environments.
- Low OPEX. Integrated design that minimizes ongoing operating costs.

15kW.png
bottom of page